Saturday 19th November 2022
John Cooper, Nigel Graham, Pete
Hann and Mike Kousiounis. One mix of cement taken in. Half used by Pete at the
dig face and the other half used by John building small retaining walls. Rather
drippy today. Several loads of muddy clatch dug out from the floor by Pete
which John and Mike “lost” in various holes. Pete reckons he lowered the floor
about 30cm. Nigel managed to reach the base of the bottom shaft. 2 hours. John.
No comments:
Post a Comment