DAVE MITCHELL'S DIG – The Early Years - by Rich Witcombe
The Original Dig
This large, shallow depression at NGR 49285434 on Charterhouse Warren Farm
was first dug by Dave Mitchell and Allan Cowley in 1962.
Dave Mitchell's log book records the events:
Feb 4th 1962
A trip to the cottage (MCG) ..... in looking at a shakehole which fell in
on Warren Farm. Digging carried out for a short spell by Allan (Cowley) and
myself and it looked very promising.
March 4th 1962
Spent a day at the Cottage where much work was done at dig on Warren Farm.
Dug down approx. 15 feet and encountered choke of small loose stones. Very
promising.
April 15th 1962
A visit to Warren Farm where no trace of previous shaft could be seen
owing to new collapse. A new shaft dug and after a day's digging bypassed
previous shaft by about 2 feet. Nothing found. Shoring placed in position for
future dig.
July 8th 1962
Warren Farm dig was found to have fallen in.
The 1980s Dig
The dig was probed again in the late 1980s by Pete and Alison Moody and
Rob Taviner. They sank a lightly shored shaft for 15', but were defeated by a
buried mass of baler twine which resisted all attempts at removal, including
bang and fire.
Reopening – From the ATLAS Log
Saturday 19 April 1997
Dave Morrison, Dave Speed, Rob Taviner, Graham Bromley, Angie Cave, Paul Stillman,
Bob Cottle, Clive North, Richard Witcombe, Pete Hann, Keith Fielder, Tony
Audsley plus a stream of visitors.
Commenced an excavation of Dave Mitchell's Dig at 8 am using a Case
Poclain tracked digger driven by Martin Ford.
After a trial trench on the western edge produced no solid rock at a depth
of 10', excavation moved to the north and eastern edges. Huge quantities of
brown soil were removed down to a depth of 15' before a possible rock floor was
encountered. Attempts to relocate this further south west involved removing the
rusting steel and galvanised iron shoring of the earlier digs together with the
infamous baler twine, but no further rock was seen down to a depth of 20'.
The earth and mud was featureless apart from occasional bands of grey clay
and patches of small stones, some possibly frost shattered.
All afternoon, the digger moved around the depression, benching itself
downwards to reach a depth of over 28'. A few larger rocks were located, giving
hope of buried cliff faces, but all proved to be displaced and surrounded by
mud. One rock did ring solid when struck by the bucket but it was at that stage
too deep to be pursued.
Work ceased at 6 pm with a general view that the search was going to prove
fruitless. Over a 40' to 50' radius and a depth of 28', there seemed to be no
solid edge to the depression.
Only DM retained his optimism that a cave would be found on the Sunday.
Sunday 20 April 1997
Dave Morrison, Dave Speed, Rob Taviner, Graham Bromley, Bob Cottle, Paul Stillman,
Pete Hann, Keith Fielder, Tony Audsley, Richard Witcombe plus other visitors.
Work on the dig resumed at 9.30 am and the digger trenched eastwards at a
depth of 25' to 30'. At 11.30 am, a small area of solid rock floor was
uncovered roughly in the centre of the depression and close to the location of
the earlier digs. The bucket then revealed a small hole approximately 1' in
diameter, which readily swallowed the loose earth around it. PH and RT went
down in the bucket to examine it and pronounced that it was in more or less
solid rock and was fretted by water erosion. It appeared to bell out below the
lip, but was largely filled by a cone of earth and mud.
A decision to safeguard and pipe it was quickly reached and DS and helpers
were sent off to Little Crapnell Farm to bring back the stock of concrete
pipes. Starting at 4.30 pm, eight 1' 9" high pipes were installed and the
surrounding pit backfilled. Work ceased at 7 pm.
A slight draught was detected emerging from the new shaft.
Wednesday 23 April 1997
Dave Speed, Graham Bromley, Rob Taviner, Paul Stillman, Pete Hann, Richard
Witcombe, Keith Fielder.
DS had brought over eight further pipes and seven of these were installed
during the evening, making the shaft some 27' deep. The excavator then
completed the backfilling of the depression.
The winch was unloaded but not set up.
Sunday 27 April 1997
Dave Speed, Richard Witcombe, Kate Lawrence, Tony Audsley, Pete Hann,
Nigel Graham, Keith Fielder plus visitors
DS set up the winch and linked bipod while the others picked stone from
the filled area.
RW commenced the underground digging by breaking up one side of the hole.
The rock yielded quite easily to blows from the small pick and it soon became
apparent that the solid rock was not that solid. In due course PH took over at
the face and started clearing in the undercut area below the hole. Instead of
water eroded rock, he found that the walls comprised cemented scree material or
breccia, which broke off very readily when hit or even brushed against.
By the end of the afternoon, RW was digging out mud and breccia from a
conical pot which seemed far too insubstantial to support the concrete rings.
About twenty bucket loads were taken to the surface, before prudence dictated a
halt.
If we are not to lose the bottom section of pipe, it will need to be
either pinned into the surrounding fill or bolted to the pipe above, or both.
It may be that we are not actually digging in a cave but rather in a water
excavated hole in a scree pile.
Wednesday 30 April 1997
Dave Speed, Paul Stillman, Kate Lawrence, Richard Witcombe.
After DS had checked that the bottom ring was still in place, we
considered the options for safeguarding the shaft:
1. Drill through the bottom pipe and drive out steel rods or angles into
the surrounding fill.
Dismissed - As the concrete is reinforced with steel, it would be
difficult to drill large diameter holes, and with no certainty of hitting any
solid rock, the rods would not offer much additional friction.
2. Connect the rings by bolting plates across the joins.
Dismissed - Drilling near the rims would weaken the pipes, and it would in
any event be a long winded job.
3. Connect all fifteen rings by three tensioned cables bolted or clipped
to the top and bottom rings.
Possible - But the steel cable and tensioners would be expensive.
4. Connect all fifteen rings by welding three strips of steel to the
connecting H sections. Where the H section is offset, a linking tab could be
welded to the strip. The top and bottom of the strip could be either clipped over
the rim of the pipes or bolted to the centre of the pipes.
Possible - And relatively cheap and speedy.
Option 4 was chosen. With all fifteen pipes linked together, the combined
friction factor should keep the tube in place within the compacted fill.
Wednesday 7 May 1997
Rob Taviner, Kate Lawrence, Tony Audsley, Pete Hann, Keith Fielder, Graham
Bromley, Dave Speed, Richard Witcombe.
Despite some heavy rain, the pipes were still in place. Both RT and GB
inspected the prospects below and between then sent up six buckets of spoil.
Small, water washed holes around the edge of the scree chamber provided some
encouragement.
DS had brought over three 15' length of flat steel bar with 6" at one
end bent at right angles. PH hammered the angled sections under the bottom ring
and then secured them in place by inserting rawlbolts through the upright
sections into the bottom ring.
An attempt was then made to weld the flat sections to the H links between
the pipes. KH descended halfway down the shaft, and the heavy, two stroke
welder was suspended above him on the winch cable. PH "fired up" the
rods, only to be immediately overwhelmed by petrol fumes. He had no option but
to abandon the welding idea.
The swirling fumes descended the shaft and were quickly drawn into the dig
- clear evidence of an inward draught.
A decision was made to return on Sunday to bolt the steel straps to the
pipes.
Wednesday 14 May 1997
Graham Bromley, Dave Speed, Kate Lawrence, Paul Stillman, Keith Fielder, Pete
Hann, Richard Witcombe, plus visitors
Sunday had been too wet to use power tools.
DS fitted a pre-fabricated, spring assisted steel lid, after which PH
successfully bolted the straps to the rings.
There was just time for KL to send up three token buckets of spoil.
Part of the shelf on which the rings rest had crumbled away. Grouting will
be needed before serious digging begins.
Sunday 18 May 1997
Bob Cottle, Dave Speed, Graham Bromley, Paul Stillman,
Tony Audsley, Richard Witcombe, Keith Fielder, Kate Lawrence.
DS followed by BC and TA sent up 28 buckets of mud and scree from the bell
chamber at the foot of the shaft. TA concentrated on enlarging the small
airspace descending at 45 degrees to the northwest, and by the end of the
session he was able to peer into a tiny straw and column filled grotto, still
entirely in scree, about 6' ahead. There appeared to be a slight outward
draught.
RW attempted to stabilise the walls and roof of the digging space with a
bucket of grout, but the scree was so loose in places that it fell off when the
concrete coating was thrown against it.
To make any further progress in even relative safety, some form of steel
shuttering structure or cage will need to follow the digger downwards.
Wednesday 21 May 1997
Mark Lumley, Rob Taviner, Paul Stillman, Kate Lawrence, Graham Bromley, Richard
Witcombe.
DS had sprained his ankle while sorting out steel, and GB and RW were
delayed by a puncture on the Land Rover.
KL had brought over some corrugated steel sheets and RW some Dexion, but
it the absence of DS's heavy steel lengths, it was decided to continue probing
carefully downwards in the floor, avoiding the unsupported and dangerous roof
leading down to the "grotto".
ML, RT and GB between them sent up twenty two buckets of spoil. The fill
no longer contains pieces of grass from the initial run in, and is likely to be
undisturbed material from here on.
Sunday 25 May 1997
Graham Bromley, Rob Taviner, Richard Witcombe, Kate Lawrence, Clive North,
Dave Morrison.
In the absence of the "engineers", RW, RT, KL and CN took turns
to dig. Twenty three buckets of scree and mud, and one trussed rock were
brought out. A further large block was uncovered in the floor – perhaps bedrock.
Tuesday 27 May 1997
Jim Young, Dave Morrison
JY welded two 6' lengths of steel angle at 45 degrees to the straps at the
bottom of the shaft. These run down towards the "grotto" close to the
dangerous section of roof.
Wednesday 28 May 1997
Paul Stillman, Graham Bromley, Richard Witcombe, Rob Taviner, Mark Lumley,
Kate Lawrence, Keith & Ros Fielder, Pete Hann.
GB managed to insert two pieces of corrugated steel sheet above the steel
angle. The sheets were then braced against the roof by means of two jammed
angle cross members.
The shoring had unfortunately reduced the access to the dig chamber and RW
had to hammer off a section of scree wall to allow the bucket to pass through.
Four token buckets of spoil were sent up. The slab in the floor appears to be a
random rock rather than bedrock. Still evidence of a draught.
Thursday 29 May 1997
Jim Young, Dave Morrison.
JY extracted the corrugated sheets in order to weld two canted cross
members to the two descending pieces of angle.
Two buckets of spoil were removed.
Sunday 1 June 1997
One of the Small brothers had harrowed the disturbed area of the
depression.
AM: Dave Morrison, Paul Stillman
Fifteen buckets of spoil removed.
PM: Graham Bromley, Bob Cottle, Rob Taviner, Paul Stillman, Richard
Witcombe. Kate Lawrence and Dave Speed later.
GB, RT, BC and PS took it in turns to dig, sending up a total of twenty
eight buckets. Some of the spoil, and some stone picked from the surface, was
taken away by Land Rover and trailer and dumped into an old stonewalling pit.
The diggers worked downwards and into the threshhold of the grotto,
encountering small rocks and plenty of wet mud. By the end of the afternoon, a
fairly solid left hand wall of larger blocks had been uncovered as well as a
well cemented, stal coated right hand wall. The 18" wide "rift"
sloped down to the grotto and round to the right into an area of loosely packed
fill with small holes and clean, water washed rock. A very encouraging strong
draught emerged from this area.
Monday 2 June 1997
Jim Young, Dave Morrison.
Welded a support bracket to the base of the shaft and two more canted
cross members.
Wednesday 4 June 1997
Graham Bromley, Kate Lawrence, Paul Stillman, Rob Taviner, Mark Lumley, Richard
Witcombe, Clive North.
GB, RW and PS sent up sixteen buckets of muddy spoil, further deepening
the threshhold of the grotto. The draught was only slight.
Sunday 8 June 1997
Dave Speed, Bob Cottle, Rob Taviner, Richard Witcombe, James Witcombe, Graham
Bromley, Kate Lawrence.
DS, RT and KL excavated thirty buckets in fairly muddy and unstable
conditions. Many minor collapses occurred, and the large blocks which were
thought to be indications of a bedrock wall turned out to be only loosely
associated! The spoil and some surface stone pickings were taken away by
trailer and dumped in the nearby stone pits.
Wednesday 11 June 1997
Mark Lumley, Rob Taviner, Dave Morrison, Dave Speed, Graham Bromley, Richard
Witcombe, Clive North, Paul Stillman.
ML, DM, GB and CN, working in pairs, sent up thirty four buckets of mud
and scree. The grotto floor is now some ten feet below the concrete shaft, and
more steel shoring is needed to prevent further collapse.
There are many small holes in the fill and hints of some development under
a large slab. The draught was fairly strong.
Spoil was dumped in the trailer.
Sunday 15 June 1997
Rob Taviner, Paul Stillman, Bob Cottle, Graham Bromley, Kate Lawrence,
Pete Hann, Dave Morrison briefly.
Forty bucket loads were sent up, including one large rock from the floor,
taking the depth of the dig to over 12' below the shaft. The left hand wall is
a partly stal coated collection of small and medium sized blocks, but every
other surface is loose or only lightly cemented. Small collapses occur
continually. The draught was negligible.
All spoil was dumped in the stone pits.
Wednesday 18 June 1997
Paul Stillman, Richard Witcombe, Graham Bromley, Rob Taviner, Mark Lumley.
Thirty bucket loads were sent up. The left hand blocks are beginning to
peter out, and the digging chamber is now very precarious. More steel shoring
is essential. Only a faint, intermittent draught.
Thursday 19 June 1997
Jim Young, Dave Morrison.
Welded two 7' vertical steel angle sections down from the pipe shaft and
linked them to the descending angles with horizontal pieces, creating two steel
triangles.
During the course of cutting back the "rear" wall of the dig to
accommodate one of the verticals, a small, loose alcove was encountered issuing
a draught. More trimming of the wall will be needed to push one of the
verticals into a parallel position ready for a horizontal cross member to be
welded in.
Concrete and stone walling will be built up from these horizontal
sections.
Sunday 22 June 1997
Richard Witcombe, Rob Taviner, Graham Bromley, Kate Lawrence.
RW sent up three buckets of slumped material from just below the concrete
rings before making a start on the concrete walling.
The spaces between the loosely cemented rubble roof and the four canted
roof beams were filled in with rock and concrete, and a few courses were laid
in the right hand steel triangle.
The recent heavy rain had produced drip in the shaft which caused
continuous minor wall collapses throughout the afternoon.
Wednesday 25 June 1997
Richard Witcombe, Paul Stillman, Graham Bromley, Kate Lawrence, Rob Taviner,
Mark Lumley, Tony Audsley, Clive North.
An inspection of Sunday's work showed that one eighth of an inch cracks
had opened up between the concrete and the canted roof beams, suggesting that
the latter had been forced downwards a fraction by the weight of the pipes.
RW walled up two thirds of the right hand triangle, working under heavy
drip, pungently contaminated with sheep droppings, and occasional scree
collapses.
Sunday 29 June 1997
Richard Witcombe, Clive North, Rob Taviner, Tony Audsley.
The gap between the concrete and the roof beams had opened up to nearly
half an inch, indicating further downward movement by the pipes.
RW finished walling up the right hand triangle, but in the absence of
further welding, could do nothing to seal up the back wall which continues to
collapse. Instead, a 3' length of steel angle was inserted on top of the
sloping steel roof sections just below the rings, and walling was constructed
upwards from this to pick up the ring above. Some of the stone was imported
from the nearby pits.
The drip had reduced slightly from last Wednesday.
Wednesday 2 July 1997
Dave Speed.
Inspected the shoring. No further movement of the steel frame.
Sunday 6 July 1997
Rob Taviner, Bob Cottle.
Cut back the rear and left hand side walls. Thirty buckets removed.
Wednesday 9 July 1997
Dave Speed, Paul Stillman.
Removed two further buckets.
Sunday 20 July 1997
Richard Witcombe, Bob Cottle, Graham Bromley, Kate Lawrence, Rob Taviner.
With the left hand steel triangle in an acceptably upright position, RW
commenced walling it up, completing about one third during the afternoon.
Wednesday 23 July 1997
Richard Witcombe, Paul Stillman, Rob Taviner, Graham Bromley, Kate Lawrence.
KL had earlier delivered a trailer-load of walling stone.
RW continued walling inside the left hand triangle, completing about two
thirds of it.
Sunday 27 July 1997
Richard Witcombe, Ken Appleby, Rob Taviner.
The surface run off from recent heavy rain had created small gullies and
deltas in the depression, and underground there was still heavy drip. The water
had disappeared into the scree choke with no sign of back up.
RW completed the stone and concrete infilling of the left hand steelwork.
Wednesday 30 July 1997
Paul Stillman, Richard Witcombe, Rob Taviner.
RT and PS sent up twenty five buckets of spoil between them, most of it
slumped scree from the walls. The large floor block was uncovered again and a
slight draught detected.
Sunday 3 August 1997
Dave Speed, Graham Bromley, Kate Lawrence.
A day of persistent rain. A mud-covered, disorientated lamb was found
collapsed in the depression, perhaps a victim of lead poisoning. It was taken
up to the farm.
Twelve buckets were brought out. Digging on the left hand side below the
step uncovered small air spaces and very loose fill, coupled with a noticeable
draught.
Wednesday 6 August 1997
Paul Stillman, Rob Taviner, Dave Speed, Kate Lawrence, Richard Witcombe.
RT and PS between them sent up fifteen buckets from the bottom of the dig.
The large block broke up when levered out.
Sunday 10 August 1997
Graham Bromley, Kate Lawrence, Dave Speed, Richard Witcombe, Rob Taviner, Paul
Stillman.
DS welded a section of angle linking the bottom of the two steel triangles
to provide a base for the back wall. The welding proved very time consuming as
the steel was galvanised and the surface generator was probably providing too
little power.
RW made a start on the concrete and stone back wall, with RT providing
some infilling material from the bottom of the dig.
The trailer, full of spoil and stuck in the mud for many weeks, was jacked
up, dug out and hauled away to the stone pit.
Wednesday 13 August 1997
Rob Taviner, Paul Stillman, Graham Bromley, Richard Witcombe.
RW continued constructing the back wall, switching to a semi-circular
shape after 18" to match the rings above and allow the easy passage of
buckets. Some backfill material had to be sent down from the surface!
The wall is now half completed.
Wednesday 20 August 1997
Paul Stillman, Richard Witcombe, Dave Speed.
Further work on the back wall. A "1997" date stone was built in.
Wednesday 27 August 1997
Dave Speed, Rob Taviner, Richard Witcombe, Paul Stillman, Len Coltham.
RW continued work on the back wall, almost reaching the concrete rings. DS
cut a length of steel angle which will be welded to form the front edge of a
concrete floor at the foot of the walls.
Saturday 30 August 1997
Dave Morrison, Jim Young, Dave Speed.
Welded the floor level cross member.
Wednesday 3 September 1997
Kate Lawrence, Richard Witcombe, Dave Speed, Paul Stillman, Len Coltham.
RW completed the back wall and a concrete and rock floor platform.
Sunday 7 September 1997
Richard Witcombe, James Witcombe, Paul Stillman, Len Coltham, Rob Taviner,
Kate Lawrence.
PS, KL and RT sent up thirty buckets of muddy scree. A few small holes
were uncovered towards the end of the afternoon, and one large rock which might
just be bedrock.
A digger's assistant is now required underground to guide the bucket past
the shoring.
The 3' steel ladder was exchanged for a 10' length.
Wednesday 10 September 1997
Richard Witcombe, Clive North, Rob Taviner, Kate Lawrence.
CN assisted by RW sent up sixteen buckets. The small holes petered out and
the large rock appears to be just that. On the credit side, larger slabs are
now appearing in the fill and some of these were left underground for future
shoring use.
More steelwork will need to be installed before any further depth is
gained.
Friday 31 October 1997
Dave Morrison, Jim Young, Rob Taviner.
JY extended the welded steel framework into the main digging chamber. Wall
frames, uprights and two canted roof sections were inserted in a day long
session.
Wednesday 20 May 1998
Richard Witcombe, Kate Lawrence, Paul Stillman, Tony Littler, Rob Taviner,
Mark Lumley, Dave Morrison.
Opening of the 1998 campaign. The digging area was dry with little
evidence of slumping. Ten buckets of scree were brought out and one small frog.
Slight draught.
DM brought over some galvanised steel mesh.
Sunday 31 May 1998
Rob Taviner, Paul Stillman, Richard Witcombe, Ken Appleby.
RT fitted cut sections of steel mesh over the roof joists, adding a
further 5' length of steel angle to the "cage".
Wednesday 3 June 1998
Paul Stillman, Richard Witcombe, Dave Speed, Rob Taviner, Mark Lumley, Tony
Boycott.
Brought out thirty buckets of scree, mainly run-in material from the
unstable section of roof and wall. Small stone falls continued throughout the
digging session, but the digger is now protected from overhead collapse.
Sunday 7 June 1998
Rob Taviner, Richard Witcombe, Bob Cottle.
Brought out twenty buckets of scree.
A female pheasant was feeding amongst the thistles in the depression.
Sunday 21 June 1998
Rob Taviner, Bob Cottle, Paul Stillman, Richard Witcombe, Kate Lawrence.
Brought out thirty buckets of muddy scree.
Collapses and run-ins have left one wall seriously undercut. More steel
shoring on which to base stone and concrete walling is urgently required.
Wednesday 24 June 1998
Richard Witcombe, Paul Stillman, Kate Lawrence.
Careful digging at the base of the stal cemented wall, which forms a 180
degree arc about 4' around. The "wall" continues downwards and the
fill is loose. Occasional puffs of fresh air could be felt. Twelve buckets were
sent out.
The undercut wall on the right is a serious threat to the stability of the
shaft, and needs to be shored and back-filled urgently.
Monday 21 September 1998
Dave Morrison, Jim Young, Paul Stillman, Kate Lawrence.
Under very trying conditions of wall collapse and run-ins, JY welded
further sections onto the steel cage creating an irregular cube within the
digging chamber.
Sunday 4 October 1998
Paul Stillman, Rob Taviner, Richard Witcombe.
Commenced walling up the very undercut right hand side of the chamber
where any further collapse would threaten the stability of the concrete pipe
foundations. The stone and concrete was laid on the steel framework and
supporting Dexion sections driven horizontally into the run-in material.
Sunday 11 October 1998
Richard Witcombe, Clive North.
Continued walling, mostly along the far side. Incorporated a drainpipe of
perforated plastic in the right hand wall. Some alarming scree falls punctuated
the afternoon, and the roof above this point is looking very unsafe.
Sunday 18 October 1998
Richard Witcombe, Bob Cottle, Paul Stillman, Rob Taviner, Max Midlen, Dave
Morrison and some Wessex casual labour.
More work on the right hand and far wall. The backfill was
"stiffened" with odd pieces of steel and wire mesh. Small rock falls
continue and the undermining is now close to the side of the entrance shaft.
Wednesday 21 October 1998
Richard Witcombe, Tony Littler.
Backfilled some of the collapse areas behind the stone and concrete walls,
using scree and rocks dug out of the floor. A few minor stone falls. No
detectable draught.
No comments:
Post a Comment