Saturday 12th November 2022
John Cooper, Pete Hann, Mike
Kousiounis, Richard Marlow, Adrian Vanderplank and Jude Vanderplank. One mix of
cement taken. First all the spoil was cleared from the 196m level to the
Tunnel. Then Pete and Rich went down to the bottom with the cement whilst the
rest of us hauled the spoil to the bottom of the entrance shaft. Finally, 18
Wayne sized loads were hauled to the surface, by which time everyone was ready
to come out. 2¾ hours. John.