Thursday 9th December 2021
John Cooper, Adrian Vanderplank and Jude Vanderplank. Drill taken in to place
anchors. While Adrian placed bottom anchor for Nigel (still needs tightening
up) John and Jude moved half a dozen loads of
clatch from bottom to a hole a couple of metres up. During exit another
hole drilled so top rope can be moved up a few metres to the soakaway area. Drippy.
1½ hours. John.
No comments:
Post a Comment