Saturday 4th December 2021
John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank.
Hauled the spoil from the bottom ledge to the Tunnel then on up to the bottom
of the entrance shaft and finally to the surface. 19 loads came up from the
bottom, but Pete reckoned 21 came to the surface. I don’t believe that count. I
reckon the vibration moved the counters along as it’s always a lesser number
that reaches the surface. Very little draught but still a few drips. 2 hours. John.
No comments:
Post a Comment