Survey
Tuesday, December 28, 2021
Tuesday 28th December 2021
John Cooper, Pete Hann and Adrian Vanderplank. A rather drippy day, foam on the
soakaway. Pete drilled holes in a couple of boulders at the bottom which were
then banged, 40gm and 12gm. Will look at the effect on Saturday. 1 hour.
Thursday, December 23, 2021
Thursday 23rd December 2021
John Cooper, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank. After a
delayed start because John forgot the ladder, spoil was moved up from the Tunnel
to bottom of entrance shaft and then on up to the surface. Twenty one loads
each time, well judged by Jude who was loading, meant the magic number of 42
was achieved. 2 hours. John.
Saturday, December 18, 2021
Saturday 18th December 2021
John Cooper, Nigel Graham, Pete Hann, Wayne Starsmore, Adrian Vanderplank and
Jude Vanderplank. Spoil moved up from bottom ledge to Tunnel (24 loads
according to Wayne). Then we moved on down and spoil moved up from bottom to
bottom ledge (now about half full) plus a bit of clatch stuffed in hole a
couple of metres up. Probably going to bang the boulder in the floor. 2½ hours. John.
Saturday, December 11, 2021
Saturday 11th December 2021
John Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. Spoil moved up
from bottom to bottom ledge and some clatch stuffed in hole a couple of metres
up from the bottom. Both recently placed anchors tightened up ready for use. No
real draught for testing so difficult to decide best way onwards. 2½ hours. John.
Thursday, December 9, 2021
Thursday 9th December 2021
John Cooper, Adrian Vanderplank and Jude Vanderplank. Drill taken in to place
anchors. While Adrian placed bottom anchor for Nigel (still needs tightening
up) John and Jude moved half a dozen loads of
clatch from bottom to a hole a couple of metres up. During exit another
hole drilled so top rope can be moved up a few metres to the soakaway area. Drippy.
1½ hours. John.
Saturday, December 4, 2021
Saturday 4th December 2021
John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank.
Hauled the spoil from the bottom ledge to the Tunnel then on up to the bottom
of the entrance shaft and finally to the surface. 19 loads came up from the
bottom, but Pete reckoned 21 came to the surface. I don’t believe that count. I
reckon the vibration moved the counters along as it’s always a lesser number
that reaches the surface. Very little draught but still a few drips. 2 hours. John.