Survey
Saturday, July 31, 2021
Saturday 31st July 2021
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. One mix of cement taken
to bottom and used by Pete wall building. Capping kit taken in and after Pete
finished wall building Adrian capped the floor. Some rocks hauled up to bottom
ledge. Nigel, escorted by Adrian, got down to just below the bottom ledge
today. More cementing and capping required. 2½ hours. John.
Saturday, July 24, 2021
Saturday 24th July 2021
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. The drill with some
short lengths of rebar and two mixes of cement taken down. One third used by
John doing remedial work just above the tunnel. Two thirds used by Pete walling
at the bottom. John dug out some rocks from the soakaway for use in his
walling. Then John took a load from the soakaway to the surface before another
4 loads were dug out by Nigel which John hauled up to the space opposite the
Naughty Step. Nigel then went out whilst John went to the bottom to join Adrian
and Pete. After Pete had fixed the rebar Adrian went out. Pete used up the
remaining cement and then John and Pete went out with the drill and cement
buckets. More cementing required. 2½ hours. John.
Saturday, July 17, 2021
Saturday 17th July 2021
John
Cooper, Pete Hann and Adrian Vanderplank. Two mixes of cement taken down. One
third used by John doing remedial work just above the tunnel. Two thirds used
by Pete walling at the bottom. Some holes in the floor and excellent draught
coming out. Probably have to be the same again next week. 2½ hours. John.
Saturday, July 10, 2021
Saturday 10th July 2021
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank. One
mix of cement taken down and used by Pete walling at the bottom. Meanwhile the
alcoves were cleared with Jude filling, Adrian hauling and John hauling and
stacking. Then moved on up and cleared the tunnel with Jude filling Adrian then
John hauling and Nigel stacking. Finally cleared 11 loads to the surface with
John and Nigel on the surface. 2½ hours. John.
Saturday, July 3, 2021
Saturday 3rd July 2021
John
Cooper, Pete Hann, Mike Kousiounis and Adrian Vanderplank. No Nigel nor Barry.
First we cleared all the spoil to the surface, 21 good loads. Then Adrian
capping at the bottom. Finally his spoil moved up to the alcoves. Cementing now
required (Pete had the sand but no cement today!). 2½ hours. John.
Thursday, July 1, 2021
Thursday 1st July 2021
John
Cooper, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank. Moved the
spoil up from the bottom step and then the alcoves to the tunnel. Then moved it
all on up to the bottom of the entrance. The majority of the team then decided
it was necessary to leave the spoil there as both Barry and Nigel would be
along on Saturday and needed something “easy” as a re-introduction. John and
Wayne were forced to visit the Hunter’s instead. 2½ hours. John.