Saturday, July 24, 2021
Saturday 24th July 2021
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. The drill with some
short lengths of rebar and two mixes of cement taken down. One third used by
John doing remedial work just above the tunnel. Two thirds used by Pete walling
at the bottom. John dug out some rocks from the soakaway for use in his
walling. Then John took a load from the soakaway to the surface before another
4 loads were dug out by Nigel which John hauled up to the space opposite the
Naughty Step. Nigel then went out whilst John went to the bottom to join Adrian
and Pete. After Pete had fixed the rebar Adrian went out. Pete used up the
remaining cement and then John and Pete went out with the drill and cement
buckets. More cementing required. 2½ hours. John.