Saturday 10th July 2021
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank. One
mix of cement taken down and used by Pete walling at the bottom. Meanwhile the
alcoves were cleared with Jude filling, Adrian hauling and John hauling and
stacking. Then moved on up and cleared the tunnel with Jude filling Adrian then
John hauling and Nigel stacking. Finally cleared 11 loads to the surface with
John and Nigel on the surface. 2½ hours. John.