Saturday, August 21, 2021
Saturday 21st August 2021
Richard
Carey, John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude
Vanderplank. Took in capping kit to use at the bottom. Came back up to alcoves
then hauled debris up until they were full. Leaving Pete at the bottom we then
moved on up and cleared all the spoil from the alcoves to the top of the
tunnel. Adrian then went back down to see how Pete was getting on whilst the
rest of us hauled all the spoil on up to the bottom of the entrance shaft.
Jude, Nigel and Richard then went out whilst John went back down to see how
things were progressing. The drill battery having just died John brought out
the capping kit leaving Adrian to bring out a dead bucket and the bang wire
from last week. 3 hours. John.
Saturday, August 14, 2021
Saturday 14th August 2021
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. Took in drill and long
bits for Pete to use at the bottom. Came back up and Adrian, John and Nigel
cleared the alcoves and then moved on up and cleared all the spoil to the
bottom of the entrance shaft. Then went
back and collected the drill and bits and took them out. Still below the
entrance stacking space when it went “thud”, 2 and a half 1m deep holes with
12gm cord. Should be spoil at the bottom of the entrance shaft and the bottom
itself for next time. 2 hours. John.
Thursday, August 12, 2021
Thursday 12th August 2021
John
Cooper, Richard Marlow, Adrian Vanderplank and Jude Vanderplank. Broke up some
rocks at the bottom. These were then hauled up to the ledge and then on up to
the alcoves. Now ready to drill and bang. 1¼ hours. John.
Saturday, August 7, 2021
Saturday 7th August 2021
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank. One
mix of cement taken to bottom and most used by Pete wall building. John used a
bit doing maintenance. Capping kit taken in and Adrian capped the floor. The
rocks from the ledge were hauled up to the alcoves by John and Adrian. Nigel,
John and Jude then moved them on up to the Tunnel. 1½ hours. John.
Saturday, July 31, 2021
Saturday 31st July 2021
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. One mix of cement taken
to bottom and used by Pete wall building. Capping kit taken in and after Pete
finished wall building Adrian capped the floor. Some rocks hauled up to bottom
ledge. Nigel, escorted by Adrian, got down to just below the bottom ledge
today. More cementing and capping required. 2½ hours. John.
Saturday, July 24, 2021
Saturday 24th July 2021
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. The drill with some
short lengths of rebar and two mixes of cement taken down. One third used by
John doing remedial work just above the tunnel. Two thirds used by Pete walling
at the bottom. John dug out some rocks from the soakaway for use in his
walling. Then John took a load from the soakaway to the surface before another
4 loads were dug out by Nigel which John hauled up to the space opposite the
Naughty Step. Nigel then went out whilst John went to the bottom to join Adrian
and Pete. After Pete had fixed the rebar Adrian went out. Pete used up the
remaining cement and then John and Pete went out with the drill and cement
buckets. More cementing required. 2½ hours. John.
Saturday, July 17, 2021
Saturday 17th July 2021
John
Cooper, Pete Hann and Adrian Vanderplank. Two mixes of cement taken down. One
third used by John doing remedial work just above the tunnel. Two thirds used
by Pete walling at the bottom. Some holes in the floor and excellent draught
coming out. Probably have to be the same again next week. 2½ hours. John.