Saturday, April 6, 2019
Saturday 6th April 2019
John Cooper,
Pete Hann (later), Adrian Vanderplank and Barry Wilkinson. Had a look at the
bottom and stacked a few rocks on the ledge before Adrian and Barry arrived.
With me at the top two positions, Adrian in the middle and Barry filling we
spend an hour hauling rocks up from the bottom. Adrian and Barry then swapped
so Adrian could do some capping. Pete then arrived and a short while later we
called it a day. Good draught coming up from the bottom. Needs a few mixes of
cemen. John.
Saturday, March 23, 2019
Saturday 23rd March 2019
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry
Wilkinson. Pete and Jude to the bottom with a mix of cement to do walling to
stack muddy gravel behind. The rest of us cleared spoil from the top stacking
space to the surface, 40 loads. Adrian and Jude swapped part way through so
Adrian could start capping. Once cleared we moved on down and made a good start
on filling it up again from the bottom stacking space, which is now clear. 3
hours. John.
Saturday, March 16, 2019
Saturday 16th March 2019
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry
Wilkinson. Pete and Jude to the bottom to start stacking muddy gravel behind
walls whilst the rest of us cleared spoil from the bottom stacking space to the
top stacking space. Once cleared we moved on down and made a good start on
filling up the bottom stacking space again. Adrian did some capping towards the
end. 3 hours. John.
Saturday, March 2, 2019
Saturday 2nd March 2019
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Barry Wilkinson. One
mix of cement sent to the bottom. Pete dug boulders out of the bottom and then
Adrian capped whilst the rest of us hauled their spoil up to the bottom
stacking space. Pete was then left with Adrian to use up the cement but they
also did more capping. The rest of us went out. 3 hours. John.
Saturday, February 23, 2019
Saturday 23rd February 2019
John Cooper, Nigel Graham, Pete Hann, Geoff Newton, Adrian Vanderplank, Jude
Vanderplank and Barry Wilkinson. One mix of cement sent to the bottom. Whilst
Pete and Adrian capped and cemented the rest of us hauled their spoil up to the
bottom stacking space. We then left Pete and Adrian creating more spoil and
cementing whilst the rest of us moved the spoil on up to the top stacking space
and then on up to the surface. Total of 17 loads. 3 hours. John.
Saturday, February 16, 2019
Saturday 16th February 2019
John Cooper (late arrival after helping in Bagpit), Nigel Graham, Pete Hann,
Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson. One mix of cement
sent to the bottom. Whilst Pete and Jude cleared spoil and did a bit of
cementing at the bottom the rest hauled spoil to the surface. I arrived as
Adrian hauled load 30 to the surface, Nigel was filling and Barry was on the
Naughty Step. I joined Adrian and hauled another 22 loads to leave plenty of
stacking space for next time. Total of 52 loads. 1 hour for me. John.
![]() |
| Did anyone mention mud? Photo by AV. |
Saturday, February 9, 2019
Saturday 9th February 2019
John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and
Barry Wilkinson. One mix of cement sent to the bottom. Whilst Pete cleared
spoil and did a bit of cementing at the bottom the rest of us hauled up to the
bottom stacking space. Adrian then replaced Pete and did some capping with the
debris being moved up to join that previously raised. The second bucket of
cement was then sent down to Pete and Jude. The rest of us hauled all the spoil
from the bottom stacking space to the top stacking space. Will need to do a
surface haul before much more can go on the top stacking space. 3½ hours. John.