John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry
Wilkinson. Pete and Jude to the bottom with a mix of cement to do walling to
stack muddy gravel behind. The rest of us cleared spoil from the top stacking
space to the surface, 40 loads. Adrian and Jude swapped part way through so
Adrian could start capping. Once cleared we moved on down and made a good start
on filling it up again from the bottom stacking space, which is now clear. 3
hours. John.