Thursday 30th March 2023
John Cooper, Rich Marlow, Alessio
Sancetta, Wayne Starsmore and Adrian Vanderplank. Allesio, Wayne and Rich had a
look at the dig face. Wayne reckons we should have gone horizontally through
the wall Pete has built. First of all the spoil was hauled from the bottom
stacking space at 184m OD up to the stacking space at 195m OD. Then we all
moved on up and hauled to the Tunnel at 208m OD. Rather drippy again today!
Another session, preferably on a dry day, to get the spoil to the surface. 2
hours. John.
No comments:
Post a Comment