Thursday, March 30, 2023
Thursday 30th March 2023
John Cooper, Rich Marlow, Alessio
Sancetta, Wayne Starsmore and Adrian Vanderplank. Allesio, Wayne and Rich had a
look at the dig face. Wayne reckons we should have gone horizontally through
the wall Pete has built. First of all the spoil was hauled from the bottom
stacking space at 184m OD up to the stacking space at 195m OD. Then we all
moved on up and hauled to the Tunnel at 208m OD. Rather drippy again today!
Another session, preferably on a dry day, to get the spoil to the surface. 2
hours. John.
Saturday, March 25, 2023
Saturday 25th March 2023
John Cooper, Nigel Graham
(Entrance shaft), Pete Hann and Adrian Vanderplank. Capping kit taken down and
used by Adrian on rocks at the bottom. One mix of cement taken down and used by
Pete at the bottom. Need the bottom stacking space clearing. Drippy! 2 hours. John.
Saturday, March 18, 2023
Saturday 18th March 2023
John Cooper, Nigel Graham
(Entrance shaft), Pete Hann and Adrian Vanderplank. One mix of cement taken
down and used by Pete at the bottom. One large rock passed up and broken up by
Adrian. Capping and cementing next week. 1½ hours. John.
Saturday, March 11, 2023
Saturday 11th March 2023
John Cooper, Pete Hann, Adrian
Vanderplank and Jude Vanderplank. One mix of cement taken down by Adrian and
John whilst Jude and Pete went down and made a start clearing clatch from the
floor. Once Pete swapped with Jude a few rocks were passed up then cementing
started. Another 3 large rocks were passed up and broken up by John. Will need
to clear the 184m OD level soon. Finally, Pete used the second load of cement
and Adrian took a couple of pictures. Same again next week. 2 hours. John.
Limestone blocks in Pensioners Pot. Photo by AV |
Limestone blocks in Pensioners Pot. Photo by AV |
Saturday, March 4, 2023
Saturday 4th March 2023
John Cooper, Nigel Graham, Pete
Hann and Adrian Vanderplank. One mix of cement taken down by Pete and John
whilst Adrian tried to coax Nigel down but he failed to reach the Tunnel again
today. All the cement was used by Pete at the bottom. A couple of loads of rock
moved up to the bottom stacking space at 184m OD. Draughting out again. Only
one mix again next week. 2 hours. John.