Saturday 7th January 2023
John Cooper, Nigel Graham, Wayne
Starsmore, Adrian Vanderplank and Jude Vanderplank. Spoil hauled up from the
bottom stacking space at 184m OD to the ledge at 196m then on up to the Tunnel
before a final haul to the bottom of the Entrance Shaft. 20 + 20 + 17 loads.
Decided we would leave the spoil there as an easy introduction for Barry on
Thursday afternoon (and I forgot to put a pully in when I picked up a ladder).
2 drippy hours. John.
No comments:
Post a Comment