Tuesday 14th June 2022
Richard Carey, John Cooper, Wayne Starsmore, Adrian Vanderplank and Jude
Vanderplank. Spoil removal. 22 loads were removed from the alcoves and
deposited at the Tunnel. This was then moved on up to the bottom of the
entrance. Finally 15 rather larger loads were hauled to the surface. 2½ hours. John.