Saturday 5th February 2022

John Cooper, Nigel Graham and Pete Hann. 2 good mixes of cement loaded into 3 buckets. Pete took the first one down which he had used up by the time John arrived with the second. During moving the third one down below the Tunnel Nigel pulled a boulder from the wall so John parked the cement whilst he removed the boulder off Nigel and stashed it in the lower alcove. All three loads of cement used at the bottom. Next week more capping and cementing. 1½ hours.

Have been reading some old reports and it has made me realise I need to be more descriptive of the location of the dig face. Today Pete was cementing in a step sideways of about 1m to create a platform before the next downwards shaft begins. John.