Saturday 26th February 2022
John Cooper,
Nigel Graham, Pete Hann and Adrian Vanderplank. 1 mix of cement taken in (capping
kit also taken in but not used). Very drippy today and the drain at the bottom
of the entrance shaft was blocked so the water was running all the way down! Walls
were built and bottom step half filled with spoil ready for clearing. On the
way out John dug out the drain and cleared a bucket of the debris to the
surface. 2 hours. John.