Thursday 27th January 2022
John Cooper, Wayne Starsmore, Andy Thompson, Adrian Vanderplank and Jude
Vanderplank. John took Andy to the dig face for a look. Then 22 loads of spoil
moved from the bottom step to the Tunnel, 21 moved on up to bottom of entrance
shaft and finally 15 loads hauled up to the surface. All now clear. 2½ hours. John.