Saturday, January 29, 2022
Saturday 29th January 2022
John Cooper,
Nigel Graham, Pete Hann and Adrian Vanderplank. 1 good mix of cement and
capping kit taken to the bottom. Rock was hauled up and filled the bottom step
before handing over to the wall building team. Now need to clear the spoil from
the bottom step. 2½ hours. John.
Thursday, January 27, 2022
Thursday 27th January 2022
John Cooper, Wayne Starsmore, Andy Thompson, Adrian Vanderplank and Jude
Vanderplank. John took Andy to the dig face for a look. Then 22 loads of spoil
moved from the bottom step to the Tunnel, 21 moved on up to bottom of entrance
shaft and finally 15 loads hauled up to the surface. All now clear. 2½ hours. John.
Saturday, January 22, 2022
Saturday 22nd January 2022
John Cooper,
Nigel Graham, Pete Hann and Adrian Vanderplank. This week took down 2 mixes of
cement and capping kit. About 1 quarter of the cement was used repairing a
loose boulder just above the Tunnel. The rest was used at the bottom. Walls
built and boulder at the bottom capped to provide even more walling material. Excess
rock was hauled up and filled the bottom step before calling it a day. Will
need the same again next week, but we will need to clear the spoil from the
bottom step first. 2½ hours. John.
Thursday, January 20, 2022
Thursday 20th January 2022
John Cooper, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank. 15 loads
of spoil moved from the alcoves to the Tunnel. Then moved on up to bottom of
entrance shaft and finally 13 loads hauled up to the surface. All now clear. 2
hours. John.
Saturday, January 15, 2022
Saturday 15th January 2022
John Cooper,
Nigel Graham, Pete Hann and Adrian Vanderplank. Last week was too wet. This
week took down 2 mixes of cement and capping kit. Walls built and boulder at
the bottom capped to provide even more walling material. Will need the same
again next week. 2 hours. John.
Saturday, January 1, 2022
Saturday 1st January 2022
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. Inspected damage from
Tuesday’s bang. Pete decided it had done just what was required. While he and
Adrian rearranged the debris I moved the spoil from the bottom ledge to the
alcoves. Nigel finally reached the dig face. Conclusion is that a couple of walling
sessions now required. 1½ hours. John.