Tuesday 28th September 2021
Richard Carey, John Cooper, Wayne Starsmore, Adrian Vanderplank and Jude
Vanderplank. 17 loads came up from the bottom ledge to the tunnel and were then
hauled up to the base of the entrance shaft. Here the flatter building rocks
were separated from the rounder rocks so they could be used to hold up the roof
as noted last Thursday. As it was windy and wet we left the final haul to the
surface to Saturday. 1½ hours. John.
No comments:
Post a Comment