Saturday 19th June 2021
John
Cooper, Pete Hann and Adrian Vanderplank. One mix of cement taken in and used
by Pete Hann walling at the bottom. Whilst Pete was doing that Adrian and John
moved the existing spoil up to the bottom alcove. Then a bit of capping by
Adrian with spoil being left at the stacking step below the alcoves. 2½ hours. John.
No comments:
Post a Comment