Saturday 8th May 2021
John
Cooper, Pete Hann, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank.
First rocks were hauled from the bottom to the alcoves. Then Adrian was sent to
the bottom to cap whilst the rest of us moved the rocks on up to the tunnel and
then on up to the bottom of the entrance shaft. By then Adrian had run out of
battery. Pete wanted to leave the surface hauling to next Saturday to be done
whilst he was cementing. 2½ hours. John.
No comments:
Post a Comment