Saturday 29th May 2021
John
Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. One mix of cement
taken in. Started with all four hauling the rocks from the alcove to the
tunnel. Then Pete was sent on down with the cement whilst the remaining three
hauled the spoil from the tunnel to the bottom of the entrance shaft. Once
completed we moved on up and hauled 17 loads up to the surface. By then Pete
had finished and followed us out. 2½ hours. John.