Survey

Survey

Saturday, October 17, 2020

Saturday 17th October 2020

John Cooper, Nigel Graham, Pete Hann, Wayne Starsmore, Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson (in his own bubble on the surface so the underground group stayed legal at 6). 10 am start. Two mixes of cement to the bottom where Pete built walls supervised(?) by Adrian. Meanwhile the rest moved 10 loads of spoil from the alcoves to the tunnel, then moved it on up to the base of the entrance and then on to the surface in only 5 (heavier) loads. Capping again next week. 1½ hours. John.

No comments:

Post a Comment