Survey
Saturday, October 31, 2020
Saturday 31st October 2020
John
Cooper, Nigel Graham, Pete Hann, Wayne Starsmore, Adrian Vanderplank and Jude
Vanderplank. One mix of cement taken in. Initially all hauled spoil up from the
bottom shelf to the midway tunnel. Pete then went cementing whilst the rest of
us hauled the spoil up to the bottom of the entrance. Then we hauled 18 loads
up to the surface, by which time Pete had finished cementing. Had to return to
rescue Nigel’s van. 3 hours. John.
Saturday, October 24, 2020
Saturday 24th October 2020
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank.
Although Adrian took capping kit down it wasn’t used. Lots of spoil hauled up
the from the bottom until the bottom ledge was quite full. Plenty of hauling
next week. 1½ hours. John.
Saturday, October 17, 2020
Saturday 17th October 2020
John
Cooper, Nigel Graham, Pete Hann, Wayne Starsmore, Adrian Vanderplank, Jude
Vanderplank and Barry Wilkinson (in his own bubble on the surface so the
underground group stayed legal at 6). 10 am start. Two mixes of cement to the
bottom where Pete built walls supervised(?) by Adrian. Meanwhile the rest moved
10 loads of spoil from the alcoves to the tunnel, then moved it on up to the
base of the entrance and then on to the surface in only 5 (heavier) loads.
Capping again next week. 1½ hours. John.
Saturday, October 3, 2020
Saturday 3rd October 2020
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank. 10 am
start. With storm Alex passing through Pete thought it might be too wet to
cement so just Adrian capping a conglomerate boulder at the bottom. One alcove
filled with spoil but the other still empty. Trickle of water reportedly heard
below, otherwise quite dry 1½ hours. John.