Survey

Survey

Saturday, October 31, 2020

Saturday 31st October 2020

John Cooper, Nigel Graham, Pete Hann, Wayne Starsmore, Adrian Vanderplank and Jude Vanderplank. One mix of cement taken in. Initially all hauled spoil up from the bottom shelf to the midway tunnel. Pete then went cementing whilst the rest of us hauled the spoil up to the bottom of the entrance. Then we hauled 18 loads up to the surface, by which time Pete had finished cementing. Had to return to rescue Nigel’s van. 3 hours. John.

Saturday, October 24, 2020

Saturday 24th October 2020

John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank. Although Adrian took capping kit down it wasn’t used. Lots of spoil hauled up the from the bottom until the bottom ledge was quite full. Plenty of hauling next week. 1½ hours. John.

Saturday, October 17, 2020

Saturday 17th October 2020

John Cooper, Nigel Graham, Pete Hann, Wayne Starsmore, Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson (in his own bubble on the surface so the underground group stayed legal at 6). 10 am start. Two mixes of cement to the bottom where Pete built walls supervised(?) by Adrian. Meanwhile the rest moved 10 loads of spoil from the alcoves to the tunnel, then moved it on up to the base of the entrance and then on to the surface in only 5 (heavier) loads. Capping again next week. 1½ hours. John.

Saturday, October 3, 2020

Saturday 3rd October 2020

John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank. 10 am start. With storm Alex passing through Pete thought it might be too wet to cement so just Adrian capping a conglomerate boulder at the bottom. One alcove filled with spoil but the other still empty. Trickle of water reportedly heard below, otherwise quite dry 1½ hours. John.