Saturday 22nd February 2020
John Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. There had been a
good water flow down the hole over the past week. One mix of cement taken to
bottom. Pete used half at the bottom whilst John continued wall of 1st
February a bit higher to create space for clatch. Once cement used up Adrian
continued capping conglomerate boulder with Pete and John hauling spoil up
bottom rope. Once Adrian had run battery low we moved on up and hauled spoil
from the top of the tunnel to the bottom of the entrance ready for a surface
haul next week, if it’s not too wet and windy! 2½ hours. John.