Survey

Survey

Saturday, February 22, 2020

Saturday 22nd February 2020

John Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. There had been a good water flow down the hole over the past week. One mix of cement taken to bottom. Pete used half at the bottom whilst John continued wall of 1st February a bit higher to create space for clatch. Once cement used up Adrian continued capping conglomerate boulder with Pete and John hauling spoil up bottom rope. Once Adrian had run battery low we moved on up and hauled spoil from the top of the tunnel to the bottom of the entrance ready for a surface haul next week, if it’s not too wet and windy! 2½ hours. John.

No comments:

Post a Comment