Saturday 21st September 2019
John Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. Pete to the
bottom with a mix of cement. With Jude loading, Adrian in the middle and me at
the bottom stacking space we emptied the various holes. By this time Pete had
finished cementing so we moved the spoil from the bottom stacking space to the
top stacking space. Finally we hauled the 18 loads up to the surface. 2½ hours. John.
No comments:
Post a Comment