Saturday, September 28, 2019
Saturday 28th September 2019
John Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. Pete took a
mix of cement down. Started with Adrian capping and sending rock up to the
various holes. Jude staked some clatch further down. Adrian and Pete swapped
over a couple of times. Finally Pete cemented at the bottom. 3 hours. John.
Saturday, September 21, 2019
Saturday 21st September 2019
John Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. Pete to the
bottom with a mix of cement. With Jude loading, Adrian in the middle and me at
the bottom stacking space we emptied the various holes. By this time Pete had
finished cementing so we moved the spoil from the bottom stacking space to the
top stacking space. Finally we hauled the 18 loads up to the surface. 2½ hours. John.
Saturday, September 14, 2019
Saturday 14th September 2019
John Cooper, Pete Hann, Matt Randall and Adrian Vanderplank. Started with
Adrian capping the floor at the bottom, passing a bucket of rocks to Pete who
passed it to Matt who passed it to me. I stuffed them in the holes so they
could be moved on up on another day. Finally Adrian and Pete swapped so Pete
could hammer more rocks and make a final decision - to continue on down. Need
to cement some boulders in place before that happens. 1½ hours. John.