Survey

Survey

Saturday, August 3, 2019

Saturday 3rd August 2019

John Cooper, Pete Hann, Mike Kousiounis, Geoff Newton and Adrian Vanderplank. Capping kit taken in but not used. First moved spoil (rock) up from bottom to bottom stacking space. Then added to the heap with rocks from the alcoves part way up. Then moved on up and shifted spoil from bottom stacking space to top stacking space. Finally hauled the 21 loads to the surface. Dig now clean. 3 hours. John.

No comments:

Post a Comment