Survey
Saturday, August 31, 2019
Saturday 31st August 2019
John
Cooper, Pete Hann and Adrian Vanderplank. Pete at the bottom digging out
clatch, me above him and Adrian stacking the mud behind the walls I’d built. A
final boulder moved on all the way to the surface. Now some cementing and
capping required. 2 hours. John.
Saturday, August 17, 2019
Saturday 17th August 2019
John
Cooper and Pete Hann. Ran a survey down to the bottom. Very wet at the bottom
of the entrance shaft so the planned survey back out taking lots of splays was
abandoned. Used DistoX but Pete wrote readings in book. I also used a small
tape recorder which revealed 3 errors in Pete’s notes. 1¼ hours. John.
Saturday, August 3, 2019
Saturday 3rd August 2019
John
Cooper, Pete Hann, Mike Kousiounis, Geoff Newton and Adrian Vanderplank.
Capping kit taken in but not used. First moved spoil (rock) up from bottom to
bottom stacking space. Then added to the heap with rocks from the alcoves part
way up. Then moved on up and shifted spoil from bottom stacking space to top
stacking space. Finally hauled the 21 loads to the surface. Dig now clean. 3
hours. John.
Subscribe to:
Posts (Atom)