Saturday 29th June 2019
John
Cooper, Pete Hann and Adrian Vanderplank. Capping kit and 1 mix of cement taken
in. Pete used half the mix at the bottom whilst John used the other half
walling alcoves for later use in spoil dumping. Adrian did some clatch dumping
in an alcove at the bottom before he moved down to do some capping. More of
both required. 2½ hours. John.
No comments:
Post a Comment