Saturday 20th April 2019
John Cooper,
Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry
Wilkinson. Pete and Jude to the bottom with a mix of cement to do walling. The
rest of us cleared spoil from the bottom stacking space to the top stacking
space then, once that was done, moved on down and started to fill it up again.
At the end we moved on up and cleared the top stacking space to the surface, 22
loads. Pete reckons another good cementing session now required. 3¼ hours. John.