Survey
Saturday, April 20, 2019
Saturday 20th April 2019
John Cooper,
Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry
Wilkinson. Pete and Jude to the bottom with a mix of cement to do walling. The
rest of us cleared spoil from the bottom stacking space to the top stacking
space then, once that was done, moved on down and started to fill it up again.
At the end we moved on up and cleared the top stacking space to the surface, 22
loads. Pete reckons another good cementing session now required. 3¼ hours. John.
Saturday, April 13, 2019
Saturday, April 6, 2019
Saturday 6th April 2019
John Cooper,
Pete Hann (later), Adrian Vanderplank and Barry Wilkinson. Had a look at the
bottom and stacked a few rocks on the ledge before Adrian and Barry arrived.
With me at the top two positions, Adrian in the middle and Barry filling we
spend an hour hauling rocks up from the bottom. Adrian and Barry then swapped
so Adrian could do some capping. Pete then arrived and a short while later we
called it a day. Good draught coming up from the bottom. Needs a few mixes of
cemen. John.