Survey

Survey

Saturday, March 23, 2019

Saturday 23rd March 2019

John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson. Pete and Jude to the bottom with a mix of cement to do walling to stack muddy gravel behind. The rest of us cleared spoil from the top stacking space to the surface, 40 loads. Adrian and Jude swapped part way through so Adrian could start capping. Once cleared we moved on down and made a good start on filling it up again from the bottom stacking space, which is now clear. 3 hours. John.

Saturday, March 16, 2019

Saturday 16th March 2019

John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson. Pete and Jude to the bottom to start stacking muddy gravel behind walls whilst the rest of us cleared spoil from the bottom stacking space to the top stacking space. Once cleared we moved on down and made a good start on filling up the bottom stacking space again. Adrian did some capping towards the end. 3 hours. John.

Saturday, March 2, 2019

Saturday 2nd March 2019

John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Barry Wilkinson. One mix of cement sent to the bottom. Pete dug boulders out of the bottom and then Adrian capped whilst the rest of us hauled their spoil up to the bottom stacking space. Pete was then left with Adrian to use up the cement but they also did more capping. The rest of us went out. 3 hours. John.