Saturday, September 1, 2018
Saturday 1st September 2018
John Cooper, Geoff Newton,
Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson. With Geoff filling
and Jude and me on surface 48 loads hauled out. 2 hours.John.
Saturday, August 11, 2018
Saturday 11th August 2018
John Cooper, Pete Hann,
Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson. Moved spoil from the
bottom stacking space to the intermediate stacking space. Then filled up the
bottom stacking space again. 2 hours.John.
Saturday, July 28, 2018
Saturday 28th July 2018
John Cooper, Nigel Graham, Pete
Hann, Geoff Newton, Adrian Vanderplank and Barry Wilkinson. Nigel and I hauled
29 loads up from the intermediate stacking space to the surface. Barry then
came out and I went in. Unknown number of loads, mainly clatch, hauled up from
bottom to bottom stacking space with Adrian doing a small amount of capping. 2½
hours.John.
Saturday, July 14, 2018
Saturday 14th July 2018
John Cooper, Pete Hann, Jude
Vanderplank, Lee Venning and Barry Wilkinson. Hauled 35 loads up from the
bottom stacking space to the intermediate stacking space whilst Pete used up a
mix of cement at the bottom. Then hauled 17 loads up to the surface, more still
there. 2 hours.John.
Saturday, June 23, 2018
Saturday 23rd June 2018
John Cooper, Pete Hann, Geoff
Newton, Wayne Starsmore, Adrian Vanderplank, Jude Vanderplank, and Barry
Wilkinson. With Barry and Wayne on the surface, me on the Naughty Step, Adrian
filling and Geoff just above him 55 loads were hauled from the Intermediate
stacking point to the surface whilst Pete and Jude were digging at the bottom.
Adrian, me and Geoff then went further down and with Jude filling at the bottom
stacking point and me stacking the four of us hauled up about 12-15 loads to
the Intermediate stacking space. I then went out leaving the remaining 4
cementing and moving rocks from the face to the bottom stacking point. 2½
hours.John.
Saturday, June 2, 2018
Saturday 2nd June 2018
John Cooper, Pete Hann, Geoff
Newton, Adrian Vanderplank, Jude Vanderplank, and Barry Wilkinson. Cementing
and clearing spoil from the bottom to the intermediate stacking space. 2½
hours.John.
Saturday, May 26, 2018
Saturday 26th May 2018
John Cooper, Pete Hann, Geoff
Newton, Adrian Vanderplank, Jude Vanderplank, and Barry Wilkinson. Hauled 26
loads to the surface from the intermediate stacking space whilst Adrian and
Pete were capping at the bottom. Then moved rocks from the bottom to the
intermediate space whilst capping continued. One mix of cement taken in and
used at the end of the session. Nice outward draught. 3 hours.John.
Subscribe to: