Saturday, December 3, 2016

Saturday 3rd December 2016

John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson. With John and Nigel on the surface 23 loads were hauled up (Thin rope used). Some capping was done during the second half then 1 mix of cement sent down. 2 hours. John.

Monday, November 28, 2016

Monday 28 November 2016

Photos taken to record where we restarted digging.

AV looking at roof. Photo PH.

Av perched on steel support. Photo PH.

Base of steel support. Photo PH.

Monday, October 10, 2016

Saturday 8th October 2016

John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Barry Wilkinson. With Nigel and Adrian on the surface 15 loads were hauled out before 2 loads of cement went in. 2 hours. John.

Saturday, September 24, 2016

Saturday 24th September 2016

John Cooper, Nigel Graham, Pete Hann, Mike Kousiounis, Adrian Vanderplank and Jude Vanderplank. Hauled 50 loads out before I’d had enough hauling. Some heavy loads! Cementing now required I’m told. 2½ hours. John.

Saturday, September 17, 2016

Saturday 17th September 2016

John Cooper, Pete Hann, Mike Kousiounis, Geoff Newton, Jude Vanderplank and Barry Wilkinson (joined for a short time by Malc Foyle and Adrian Vanderplank). Hauled 40 loads out before Pete drilled some holes and more spoil was created at the bottom. 2½ hours. John.

 

Saturday, August 27, 2016

Saturday 27th August 2016

John Cooper joined Pete Hann, Charlotte Hilton, Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson about ¾ of the way through their session. ½ hour. John.

Saturday, August 13, 2016

Saturday 13th August 2016

John Cooper, Nigel Graham, Aubrey Newport, Geoff Newton, Adrian Vanderplank and Barry Wilkinson. 64 loads hauled out before 3 holes (10mm x ~500mm 40gm) drilled and fired. 3 hours. John.