Saturday, February 23, 2019
Saturday 23rd February 2019
John Cooper, Nigel Graham, Pete Hann, Geoff Newton, Adrian Vanderplank, Jude
Vanderplank and Barry Wilkinson. One mix of cement sent to the bottom. Whilst
Pete and Adrian capped and cemented the rest of us hauled their spoil up to the
bottom stacking space. We then left Pete and Adrian creating more spoil and
cementing whilst the rest of us moved the spoil on up to the top stacking space
and then on up to the surface. Total of 17 loads. 3 hours. John.
Saturday, February 16, 2019
Saturday 16th February 2019
John Cooper (late arrival after helping in Bagpit), Nigel Graham, Pete Hann,
Adrian Vanderplank, Jude Vanderplank and Barry Wilkinson. One mix of cement
sent to the bottom. Whilst Pete and Jude cleared spoil and did a bit of
cementing at the bottom the rest hauled spoil to the surface. I arrived as
Adrian hauled load 30 to the surface, Nigel was filling and Barry was on the
Naughty Step. I joined Adrian and hauled another 22 loads to leave plenty of
stacking space for next time. Total of 52 loads. 1 hour for me. John.
![]() |
| Did anyone mention mud? Photo by AV. |
Saturday, February 9, 2019
Saturday 9th February 2019
John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and
Barry Wilkinson. One mix of cement sent to the bottom. Whilst Pete cleared
spoil and did a bit of cementing at the bottom the rest of us hauled up to the
bottom stacking space. Adrian then replaced Pete and did some capping with the
debris being moved up to join that previously raised. The second bucket of
cement was then sent down to Pete and Jude. The rest of us hauled all the spoil
from the bottom stacking space to the top stacking space. Will need to do a
surface haul before much more can go on the top stacking space. 3½ hours. John.
Saturday, January 26, 2019
Saturday 26th January 2019
John
Cooper, Nigel Graham, Pete Hann, Wayne Starsmore and Adrian Vanderplank. One
mix of cement sent to the bottom. Whilst Adrian capped rock at the bottom the
rest of us moved it up to the lower intermediate stacking space. Then Adrian
left the bottom to Pete who was able to cement up whilst the rest of us moved
spoil from the lower intermediate stacking space to the upper intermediate
stacking space. 3 hours. Pete’s flat front tyre then delayed us another hour. John.
Saturday, January 19, 2019
Saturday 19th January 2019
John
Cooper, Nigel Graham, Pete Hann, Geoff Newton, Jake Tebbutt, Adrian
Vanderplank, Jude Vanderplank and Barry Wilkinson. One mix of cement sent to
the bottom. Whilst Pete and Adrian capped and cemented at the bottom the rest
of us moved spoil from the lower intermediate stacking space to the surface. 48
loads removed. 2½ hours. John.
Saturday, January 12, 2019
Saturday 12th January 2019
John
Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. One mix of cement
sent to the bottom. Whilst Adrian capped rock at the bottom the rest of us
moved it up to the lower intermediate stacking space. Then Adrian left the
bottom to Pete who was able to cement up and also lift more rock out. The lower
intermediate stacking space getting rather full now. 3½ hours. John.
Saturday, January 5, 2019
Saturday 5th January 2019
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Barry Wilkinson. One
mix of cement sent to the bottom with Pete. To start Adrian capped rock at the
dig face whilst the rest of us hauled it up to the lower intermediate stacking
space. Then Pete cemented whilst the rest of us hauled from lower intermediate
stacking space to the top intermediate stacking space. 3½ hours. John.