Saturday, April 23, 2022
Saturday 23rd April 2022
John Cooper, Nigel Graham, Pete
Hann and Adrian Vanderplank. 2 mixes of cement taken in (split over 3 buckets)
as well as capping kit. Pete used some of the first bucket and Adrian then did
a bit of capping. After John and Nigel had a look at the bottom (looks
horrible) Pete used up the rest of the cement building walls with no
foundations! Lots more cement required. 2 hours. John.
Saturday, April 16, 2022
Saturday 16th April 2022
John Cooper, Nigel Graham, Pete
Hann and Adrian Vanderplank. 2 mixes of cement taken in (split over 3 buckets)
as well as capping kit. Pete had used up first bucket by the time capping kit
arrived. Adrian then did a bit of capping before the end of the capping rod
broke off. Final 2 buckets of cement used up building more walls. 2½ hours. John.
Saturday, April 9, 2022
Saturday 9th April 2022
John Cooper, Nigel Graham, Pete
Hann, Adrian Vanderplank and Jude Vanderplank. Plans changed as Jude graced us
with her presence. Adrian took capping kit to the bottom. Pete and I took 1 mix
of cement in. Whilst Adrian capped, the rest of us hauled 22 loads up from the
bottom to the bottom step. Then Pete started walling, aided by Jude, whilst
Nigel and I cleared all the spoil from the bottom step up to the alcoves. Then
I went down and collected the capping kit leaving Pete to complete his walling.
2½ hours. John.
Saturday, April 2, 2022
Saturday 2nd April 2022
John Cooper, Pete Hann and Adrian
Vanderplank (Nigel forgot his wellies so walked back to Upper Pitts instead of
digging). Capping and clatch removal, the stacking space at the bottom is now
full. Pete reckons a double mix of cement next week and he can use a lot of the
rocks building walls while Adrian caps the lip from the next drop. 3 hours. John.