Saturday, April 24, 2021
Saturday 24th April 2021
John
Cooper, Pete Hann and Adrian Vanderplank. Capping at the bottom to make it a
bit wider then more rocks hauled up to the bottom stacking space. Spoil now
needs moving on up. 2¾ hours. John.
Saturday, April 17, 2021
Saturday 17th April 2021
John
Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. One mix of cement
taken down. Some rocks hauled up to the alcoves, not full yet. Wall built at
bottom. Needs widening again. 2 hours. John.
Saturday, April 10, 2021
Saturday 10th April 2021
John
Cooper, Pete Hann and Adrian Vanderplank. Took drill and some cord down. Whilst
Pete drilled 3 x 600mm holes Adrian and I moved the small amount of spoil up to
the alcoves. After a problem with the firer it was fitted with new batteries
and Adrian descended again. Only just heard on the surface. 1½ hours. John.
Saturday, April 3, 2021
Saturday 3rd April 2021
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Jude Vanderplank (Barry
Wilkinson brought the rock cakes over). Whilst Nigel removed his ropes for
cleaning and inspection Adrian capped a bit at the bottom which was hauled up
by Pete, Jude and John and stacked at the bottom stacking space. Probably a bit
of cord next time. 2 hours. John.