Survey
Saturday, September 26, 2020
Saturday 26th September 2020
John Cooper, Nigel Graham, Pete Hann, Wayne Starsmore and Barry Wilkinson.
Started where we finished last week. With Pete filling, Wayne above him and John
above Wayne all the spoil was passed to Nigel to stack at the bottom of the
entrance. Once this was complete Nigel went to the surface to assist Barry.
With Pete filling and Wayne moving the buckets up the slope, John on the
Naughty Step, Barry and Nigel hauled 23 loads to the surface to leave the dig
clear of spoil. 2 hours. John.
Saturday, September 19, 2020
Saturday 19th September 2020
John Cooper, Nigel Graham, Pete Hann, Wayne Starsmore, Adrian Vanderplank and
Jude Vanderplank. One mix of cement taken in. First moved spoil up from bottom
to step, Pete loading, Wayne above and John stacking. Then while Pete did some
cementing we moved it on up to the alcoves and then on up to the tunnel. Once
that was completed Jude went down to join Pete and a bit more spoil moved on up
to the alcoves and then on up to the tunnel. Finally we made a start on moving
the spoil up from the tunnel but after only a few loads Pete and Jude had
finished cementing so we all left. 2 hours. John.
Saturday, September 12, 2020
Saturday 12th September 2020
John Cooper, Pete Hann, Matt Randall, Adrian Vanderplank and Jude Vanderplank.
First hour moved spoil up from bottom to alcoves. Jude loading, Pete above,
Matt next, Adrian next and me stacking in alcoves. Then Pete drilling with Jude
assisting while rest moved spoil up from alcoves to mid tunnel for another
hour. Matt loading, Adrian above him and me hauling then stacking. All clear by
time charge ready for firing. Didn’t hear it on surface but heard a little way
down entrance shaft. 2 hours. John.
Saturday, September 5, 2020
Saturday 5th September 2020
John Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank, Jude Vanderplank and
Barry Wilkinson. Cleared spoil from top half of cave. With Pete filling at the
tunnel, me hauling and emptying at stacking space, Nigel filling, Adrian
passing buckets up, Jude on Naughty Step and Barry on surface the first hour
was spend clearing from the Tunnel. Once done Adrian and Pete went on down to
start capping. I took over from Jude who replaced Adrian and we spend the next
hour clearing the top stacking space. I then left and digging finished another
hour later. 2-3 hours. John.