Saturday, January 25, 2020
Saturday 25th January 2020
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. One mix of cement taken
to bottom which Pete used wall building. While he was doing this the rest of
used moved rocks up from where John had stacked them last week. Once Pete
finished cementing we moved on up and cleared the spoil to the top stacking
space, all ready for the surface next time. Bad day for Nigel. First he
splashed cement into his eyes, then his light failed and finally he wrenched
his shoulder so he was sent out early. 2 hours. John.
Saturday, January 18, 2020
Saturday 18th January 2020
John
Cooper, Pete Hann and Adrian Vanderplank. Carried drill to bottom. First Pete
levered off shattered rock which Adrian passed up to John to stash. Then Adrian
replaced Pete and capped more off. Meanwhile Pete came up to where John had
stashed rock and John moved on up. We then moved the rock on up until John ran
out of stacking space. Nice outward draught today. 2 hours. John.
Saturday, January 11, 2020
Saturday 11th January 2020
John
Cooper, Pete Hann and Adrian Vanderplank. John carried drill to bottom. Pete
drilled 8mm holes for 12gm cord in boulder on floor and on side. Adrian then
set up charge whilst John carried drill out. Adrian brought out wire and firer
with the two of them being chased out by the fumes (good outward draught
today). 1 hour. John.
Saturday, January 4, 2020
Saturday 4th January 2020
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. Two mixes of cement done,
split into 3 and 2 sent to the bottom with Pete. Whilst Pete and Adrian cemented
at the bottom John continued cementing higher up. 1½ hours. John.