John Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. Two mixes of cement taken in. Two thirds were taken to the bottom which Pete used up walling in a big boulder. I used the other third continuing the work I started on 5th October. I still need to more whilst Pete hopes Adrian will be capping downwards next week. 1½ hours. John.

Saturday, October 12, 2019

Saturday 12th October 2019

John Cooper, Pete Hann and Adrian Vanderplank. One mix of cement taken to bottom which Pete used up walling. Very drippy today. Adrian capped a bit. 2 hours. John.

Saturday, October 5, 2019

Saturday 5th October 2019

John Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. Nigel did 2 mixes of cement which the rest of us took down along with the capping kit. Whilst Pete used one third of the cement at the bottom I used the rest building a retaining wall where the trickle of water was washing out the mud fill part way down. Adrian then finished by capping a large conglomerate boulder at the bottom. Still more capping and cementing required. 2½ hours. John.