John
Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. Two mixes of cement
taken in. Two thirds were taken to the bottom which Pete used up walling in a
big boulder. I used the other third continuing the work I started on 5th
October. I still need to more whilst Pete hopes Adrian will be capping
downwards next week. 1½ hours. John.
Saturday, October 12, 2019
Saturday 12th October 2019
John
Cooper, Pete Hann and Adrian Vanderplank. One mix of cement taken to bottom
which Pete used up walling. Very drippy today. Adrian capped a bit. 2 hours. John.
Saturday, October 5, 2019
Saturday 5th October 2019
John
Cooper, Nigel Graham, Pete Hann and Adrian Vanderplank. Nigel did 2 mixes of
cement which the rest of us took down along with the capping kit. Whilst Pete
used one third of the cement at the bottom I used the rest building a retaining
wall where the trickle of water was washing out the mud fill part way down.
Adrian then finished by capping a large conglomerate boulder at the bottom.
Still more capping and cementing required. 2½ hours. John.