Saturday 26th January 2019
John
Cooper, Nigel Graham, Pete Hann, Wayne Starsmore and Adrian Vanderplank. One
mix of cement sent to the bottom. Whilst Adrian capped rock at the bottom the
rest of us moved it up to the lower intermediate stacking space. Then Adrian
left the bottom to Pete who was able to cement up whilst the rest of us moved
spoil from the lower intermediate stacking space to the upper intermediate
stacking space. 3 hours. Pete’s flat front tyre then delayed us another hour. John.
Saturday, January 19, 2019
Saturday 19th January 2019
John
Cooper, Nigel Graham, Pete Hann, Geoff Newton, Jake Tebbutt, Adrian
Vanderplank, Jude Vanderplank and Barry Wilkinson. One mix of cement sent to
the bottom. Whilst Pete and Adrian capped and cemented at the bottom the rest
of us moved spoil from the lower intermediate stacking space to the surface. 48
loads removed. 2½ hours. John.
Saturday, January 12, 2019
Saturday 12th January 2019
John
Cooper, Pete Hann, Adrian Vanderplank and Jude Vanderplank. One mix of cement
sent to the bottom. Whilst Adrian capped rock at the bottom the rest of us
moved it up to the lower intermediate stacking space. Then Adrian left the
bottom to Pete who was able to cement up and also lift more rock out. The lower
intermediate stacking space getting rather full now. 3½ hours. John.
Saturday, January 5, 2019
Saturday 5th January 2019
John
Cooper, Nigel Graham, Pete Hann, Adrian Vanderplank and Barry Wilkinson. One
mix of cement sent to the bottom with Pete. To start Adrian capped rock at the
dig face whilst the rest of us hauled it up to the lower intermediate stacking
space. Then Pete cemented whilst the rest of us hauled from lower intermediate
stacking space to the top intermediate stacking space. 3½ hours. John.