Saturday 13th October 2018
John Cooper, Nigel Graham,
Pete Hann, Mike Hood, Adrian Vanderplank and Jude Vanderplank. With Mike and
Nigel on the surface, me on the Naughty Step, Adrian below me and Pete filling
we hauled 42 heavy loads of spoil to the surface. We then moved down to where
Jude had been filling bags with mud and these and some rock that Adrian capped
were moved up to the bottom stacking space. Good outwards draught. 3 hours. John.
Saturday, October 6, 2018
Saturday 6th October 2018
John Cooper, Pete Hann, Wayne
Starsmore, Adrian Vanderplank and Jude Vanderplank. Hauled spoil from the dig
face to the bottom stacking space and then moved it on upwards to the
intermediate stacking space (38 loads). Good outwards draught. 2½ hours.John.